Managing Strip Outs in Heritage Listed Buildings in Melbourne

23 October 2025

Melbourne’s architectural diversity means many businesses operate from heritage-listed premises. These are buildings rich in history but governed by strict conservation rules. When it comes time to vacate, a standard commercial make good can become a delicate restoration project that’s impacted by stringent laws around heritage protection.

Carrying out a heritage strip-out without specialist guidance is extremely risky. Even removing a partition or conduit can damage protected materials, resulting in fines, stop-work orders, or costly remediation. This guide outlines the key stages and considerations for completing a compliant make good in one of Melbourne’s heritage-listed buildings.

Speak to our team today about your commercial make good requirements.

The legislative landscape of heritage strip-outs

Working on a heritage building is not like defitting a modern office tower. Every action is bound by legislation designed to safeguard the property’s cultural value.

In Victoria, two primary frameworks protect heritage properties. The Victorian Heritage Register, managed by Heritage Victoria, covers buildings and sites of state significance. Any alteration, removal, or demolition requires a permit, with even minor works receiving close scrutiny. Most heritage properties in Melbourne, however, fall under a Heritage Overlay within the local council planning scheme. These overlays protect places of local significance and require a planning permit from councils such as the City of Melbourne or City of Yarra.

For tenants, the first task is confirming which framework applies. All make good works must comply with both the lease terms and the relevant heritage authority’s conditions.

Permits and approvals: what tenants must know

Before any physical work begins, tenants must secure statutory approval. Unlike standard building permits, heritage applications focus on preserving historical integrity. The application must include detailed architectural drawings, heritage notes, and photographic records. A Heritage Impact Assessment (HIA), prepared by a qualified consultant, is mandatory to demonstrate that the works will not diminish the building’s cultural significance.

Approval can take months rather than weeks, so tenants should factor in this timeframe early. Failing to plan for it can result in holdover penalties if the lease ends before completion.

Pre-commencement due diligence

In heritage projects, preparation is critical. Tenants must go beyond simply reviewing the lease clause and conduct a thorough assessment of the building’s protected features.

The Heritage Impact Assessment is the foundation of any compliant heritage strip-out. It identifies significant features, defines no-go zones, and ensures the project proceeds with care. The HIA maps out protected finishes, including those that may appear modern but form part of the building’s historic character. It must also justify every proposed removal, proving that each action will not damage or devalue the structure. Most importantly, it outlines the approved methodology for carrying out works, often requiring hand tools, vibration-free cutting, or protective measures around delicate materials.

Proceeding without an approved HIA can result in immediate enforcement action, work stoppages, and significant penalties.

Execution: precision, not demolition

A heritage strip-out demands patience and precision. Efficiency takes second place to preservation. Contractors often need to reverse-engineer previous installations, carefully dismantling non-heritage elements piece by piece. For example, a modern conduit fixed through an old architrave must be unscrewed and recorded rather than pulled free.

Protecting the original building fabric is equally important. Features such as pressed metal ceilings, plaster walls, and decorative timberwork must be shielded during the process. This often involves low-impact tools and temporary protection systems. Many heritage buildings also contain asbestos, which requires comprehensive surveys and licensed abatement under WorkSafe Victoria regulations.

The specialist team required

Managing a heritage make good demands more than general building expertise. Success relies on an integrated team of conservation and construction professionals. A heritage architect or consultant should oversee the project, interpreting the HIA on-site and ensuring compliance with conservation standards. Their involvement provides assurance to landlords and authorities alike.

The construction team must also consist of contractors experienced in conservation-grade demolition and restoration. These specialists understand heritage materials like lime plaster, soft timber, and traditional mortars, and have the skill to remove modern elements without damaging the original structure.

Compliance and monitoring during works

Heritage authorities often maintain oversight throughout the project. Permits can include inspection stages, known as holding points, where works must pause until the authority approves the next phase. These checks are especially common when uncovering original walls or ceilings.

If any condition of the permit or HIA is breached, the authority may issue a stop-work order. Rectifying such an order usually involves submitting revised plans and completing remedial work, delaying completion and increasing costs.

Avoiding penalties and securing a compliant handover

The financial stakes in a heritage strip-out are significant. Heritage Victoria and local councils can impose substantial fines for unauthorised works or damage to protected fabric, sometimes exceeding six figures. Landlords may also claim damages for non-compliant restorations, recovering the cost of engaging their own conservation specialists.

Delays caused by stop-work orders or slow approvals can also result in tenants holding over past their lease expiry, triggering rent penalties until final approval is granted. The only way to avoid these outcomes is to engage experts who understand the balance between heritage law, construction logistics, and tenancy obligations from the start.

Book a meeting with Makegoods.com.au today

Navigating a heritage strip out is a journey through regulatory red tape and specialised construction demands. It requires a singular focus on preservation and compliance that general project managers rarely possess. Don’t gamble your exit security on a generic commercial defit contractor.

Book a meeting with our team today.